KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  6-18-2008
Number of Hours:  5.25
Manual Reference:  10-2, 10-3
Brief Description:  Brake line and gear leg fairing installation

Today I installed the brake lines from the fuselage bulkhead fitting to the brake assembly. Then I cut gear leg fairings as per the template on drawing C3. Lastly I cut the gear leg fairing hinges to length and drilled them.
' style=

Brake line installed

Brake line installed

' style=

Gear leg fairing trimmed and trial fit

Gear leg fairing trimmed and trial fit

' style=

Gear leg fairing hinges cut to length and drilled

Gear leg fairing hinges cut to length and drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.